Database Migration

Engine, version and platform migrations with rehearsed cutover, verification and a tested rollback.

Structured migration between database engines, versions or hosting environments โ€” with a cutover plan that fits inside the outage window you can actually get approved.

Common drivers are licence cost, an engine reaching end of support, consolidation after a merger, or moving from physical servers to virtualised or containerised infrastructure. The technical work is usually the manageable part; the risk sits in the cutover, the rollback and the verification that the new system holds the same data as the old one.

Who it’s for

Organisations facing a database platform change they cannot afford to get wrong.

  • Institutions reducing proprietary licence cost by moving to an open-source engine
  • Teams running a database version approaching or past end of support
  • Organisations consolidating systems after a merger or reorganisation
  • IT departments moving databases from physical hardware to virtual or containerised platforms

What we deliver

A rehearsed migration with a tested rollback and a documented verification that the data survived.

Assessment

Schema, data-type, stored-procedure and application-dependency analysis, with the incompatibilities identified up front rather than discovered at cutover.

Migration design

Method, sequencing and cutover approach chosen against your acceptable outage window.

Schema and object conversion

Tables, constraints, indexes, views, procedures and jobs converted and reviewed.

Data migration build

Repeatable, automated migration process โ€” not a one-off manual run.

Rehearsal

Full dress rehearsal against production-scale data, timed, so the cutover window is known rather than estimated.

Verification

Row counts, checksums and business-level reconciliation proving the target matches the source.

Rollback plan

A tested path back, because the decision to abort must be available during the window.

Cutover support

Our people present during the cutover and the period immediately after it.

Migration paths we handle

  • Microsoft SQL Server โ†’ PostgreSQL
  • Oracle โ†’ PostgreSQL
  • MySQL โ†’ PostgreSQL
  • Legacy MySQL โ†’ modern MySQL / MariaDB
  • Physical โ†’ virtual
  • Virtual โ†’ containerised
  • Version upgrades within an engine

How it connects to the rest of your stack

Nothing we deploy is meant to stand alone. These are the joins we build as part of the same engagement.

  • Defect tracking โ€” Discrepancies found after cutover are logged and tracked formally, not handled ad hoc while everyone is tired.
  • Project governance โ€” Migrations run as governed projects with a genuine go/no-go gate at the cutover boundary โ€” the single most useful control in this kind of work.
  • High availability โ€” Migration is the natural moment to introduce replication, since the target is being built from scratch.

Engagement summary

Who it’s for
Application owners, IT managers, institutions reducing licence cost or exiting end-of-life platforms
What you get
Assessment, converted schema, automated migration, rehearsal, verification, rollback plan, cutover support
Deployment
Bare metal, virtual machine, container, or an air-gapped segment โ€” on your hardware or hardware we supply.
Typical engagement
Assessment, design, build, rehearsal, cutover, post-cutover support
Ownership
You own the data, the configuration and the workflows. The software is open source; there is no licence that can be withdrawn.

Next step

Thirty minutes to turn your IT into an advantage.

Schedule a complimentary, 30-minute consultation where we’ll cut through the complexity to clarify your mission, address your challenges, and define your objectives. Together, we’ll identify your highest-impact priorities, design a tailored solution, assess its business value, and chart a clear roadmap to harness the full agility of your IT โ€” turning it from a flexible tool into a decisive advantage.

Typical response within one business day.

Share with